Back to Gagne ton AO : mémoire technique MAPA pour PME

The draft bid

This example shows a document that the The draft bid magik would produce. The lab does not exist yet: Mojo builds it the moment you click, with your hours, your prices and your tone. What you read below was invented for this page.

MANUSCRITGagne ton AO : mémoire technique MAPA pour PME › The draft bidExample

The draft bid

Technical bid - extract, Environmental performance criterion (20 points)

Site waste management

Across the three most comparable recent road jobs, the split was as follows: 78 percent of asphalt taken to a recycling centre 14 kilometres away, 14 percent of soil reused on site, 8 percent non-recoverable waste. The corresponding waste tickets are attached in appendix 3.

On this contract, the chosen recycling centre is 9 kilometres from the site, which brings the transport line below that of the three references cited.

What we are not promising

We are not committing to a soil reuse rate before the analysis provided for in the specification. The site contains an old fill whose nature is not documented in the consultation pack. We would rather announce a range of 10 to 30 percent and hold it than a single figure that would not survive the first borehole.

Monitoring

A monthly tonnage tracking table, by stream and by destination, handed to the supervising engineer with the works statement.

This section runs to one page, as the grid expects. The figures come from your last three jobs, not from a template.

This lab can be yours, with your data where this example stands.

Mojo builds it during the customize session. Small companies bidding for public contracts with no bid team: that is who this one is for.